asphalt revetment
英
美
- 沥青护坡
双语例句
- By adopting jet grouting, ground water was controlled effectively, and thus further excavation and implementation of the scheme of grouted rubble revetment were ensured.
采用高压旋喷注装进行止水防渗处理后,地下水得到了有效的控制,保证了基坑进一步开挖和装砌块石护坡方案的顺利施工。
相关词汇
大家正在查
Copyright © 2023 256查询网 All Rights Reserved